What to Do After Your Salt Spray Test Chamber Arrives?

2026-01-08

Share:

What to Do After Your Salt Spray Test Chamber Arrives?


A 6-Step Guide from Unboxing to First Test.


Your TEMAK Salt Spray Test Chamber has arrived safely. What's next?

Don't worry. At TEMAK, we deliver more than just equipment; we deliver a complete service process.

We have outlined a standardized 6-step workflow from receipt of the chamber to completing your first test, ensuring you can get started easily and test with confidence.


✅ Step 1: Joint Inspection & Verification



Our service engineer will be on-site to unbox the chamber with you and execute the standardized handover procedure:

Visual Inspection: Confirm the chamber has no shipping damage such as dents, deformation, or scratches.

Accessory Inventory: Verify all accessories against the checklist.

Standard accessories typically include: Operation manual, Controller manual, Glass nozzles, Filters, Graduated cylinders & collectors, NaCl, Optional pure water system, pH meter, Salinity meter, Various installation pipes/fittings, and Sample racks.


✅ Step 2: Site Preparation & Chamber Placement


Please ensure the following conditions are met before the chamber is installed:

Item

Requirement

Explanation

Ambient Environment

18-28°C, ≤85% RH

Avoid direct sunlight. A dedicated room is

recommended.

Power Supply

AC220V/380V ±10%, Independent circuit breaker

Must include leakage protection.

Air Supply

≥5 Kg/cm², Clean, dry compressed air

An air filter/regulator with oil-water separator

is mandatory.

Water Supply

Pure water recommended (Resistivity ≥0.5 MΩ·cm)

Prevents nozzle and line clogging from mineral

deposits.

Exhaust & Drain

Separate drain and exhaust pipes. Exhaust must vent outdoors.

Prevents corrosion of the indoor environment and

equipment.

✅ Step 3: Installation, Debugging & Solution Preparation


Our service engineer will handle the connections, pressure adjustment, and provide comprehensive training:

Connection: Secure all water, air, and drain lines, ensuring no leaks.

Pressure Adjustment: Set the spray pressure regulator to a stable 1.0 ± 0.1 kg/cm².

Salt Solution Preparation (for 5% Neutral Salt Spray):

Use the provided NaCl and pure water.

Mix at a ratio of 50g NaCl per 950ml of pure water.

Use the salinity meter and pH meter to calibrate, ensuring concentration and pH (6.5-7.2) meet standards.


Solution Charging Procedure:


First, fill the Saturation Tower: For initial use or when low, add pure water to the tower via its fill port. TEMAK chambers feature auto-fill to a precise ball-float controlled level.

Then, fill the Salt Solution Tank: Add the prepared 5% salt solution to the main solution tank. This is the spray "reservoir."

Power On & Preheat: Start the chamber and set temperatures (e.g., Chamber: 35°C, Saturation Tower: 47°C). During warm-up, the water level in the tower may rise slightly due to thermal expansion—this is normal.

Operation Monitoring: Once spraying begins, compressed air will continuously carry moisture from the tower. The water level should decline slowly and steadily. A rapid drop indicates a potential leak. TEMAK chambers are equipped with a "Low Saturation Tower Water Level" alarm which will automatically shut down the unit to prevent heater damage.


✅ Step 4: Operational Training & First Test Setup


Our engineer provides on-site training covering:

Start-up & Navigation: Power on the touchscreen controller and familiarize yourself with the interface.

Select Test Mode: Choose, for example, "Neutral Salt Spray (NSS) Test."

Set Key Parameters:

Chamber Temperature: 35.0°C

Saturation Tower Temperature: 47.0°C

Spray Duration: Set for the first run (e.g., 24h).

Place Samples & Collectors:

Place samples on the racks at a 15°-30° angle, with ≥2cm spacing between them.

Position the 80 cm² collection cups at standard locations inside the chamber (per ASTM B117).

Start the Test: Click "Run," close the chamber lid. The test begins automatically.

Document Sign-off: Jointly sign the Acceptance Form, Accessory Checklist, and Function Verification Form.


✅ Step 5: Test Monitoring & Data Verification


Real-time Monitoring: View temperature, time, and alarm status on the touchscreen.

Settlement Rate Verification (Post-test):

After the test, use a graduated cylinder to measure the volume collected in each cup.

The standard collection rate is 1.5 ± 0.5 ml/h per 80 cm².


✅ Step 6: Test Completion & Routine Maintenance


Shutdown Procedure: Stop spray → Activate demisting (if applicable) → Open lid and remove samples → Drain remaining salt solution → Wipe down the chamber interior.

Routine Maintenance:

Clean the chamber interior walls and nozzles after each test.

Regularly check filters, water levels, and pipe seals.




TEMAK Support – Throughout Your Journey


From handover training to ongoing operation, we are with you:

On-site Training: Ensures your operators can use the equipment independently and safely.

Continuous Technical Support: Hotline consultation, remote guidance, and rapid on-site service.

Genuine Spare Parts Supply: Original parts to ensure long-term, stable operation.